Xconomy

From Ze-gen Ramps Up its Waste Gasification Process: Lessons from a Clean-Energy Startup:

2-furnace
2-furnace

Feedstock eventually drops into the gasification furnace, which is half-filled with molten copper.

    

Business, life sciences, and technology news — covering Boston, Seattle, San Diego, Detroit, San Francisco, New York and beyond.

© 2007-2012, Xconomy, Inc. Xconomy is a registered service mark of Xconomy, Inc. All rights reserved.

Site produced by Andrew Koyfman with design from Rob Hunter.